Fees & Charges
Schedule Of Fees And Charges
1) Building Permit and Sanction Fees
2) Multiplying Factor
3) Building Plan Proposal Application Fees
4)Wet Work Charge (WT) & Stacking Fees (ST)
5) Waste Water Charges (WS)
6) Fees For Drainage Development (New Proposal)
7) License Fees for Technical Personnel
8) Fees for Internal Deviation
9) Fees for Completion certificate
10) Fees for Revised sanction
11) Charges for installation of Tower/Antenna/Pole (Subject to NOC from respective authority)
12) Rate for demolition work
Building Permit and Sanction Fees
Basic Building Permit/Sanction fees will be calculated considering the following:-
(20 + Factor from table 1+ Factor from table 2) x A,
Where A is the total area of construction including Stair and Lift Machine Room
Table 1
Road Width | Factor to be Used |
Upto 3.5 m. | 0 |
Above 3.5 m &. upto 7 m. | 1 |
Above 7 m. upto 10 m. | 2 |
Above 10 m. upto 15 m. | 3 |
Above 15 m. upto 18 m. | 4 |
Above 18 m. upto 24 m. | 5 |
Above 24 m. upto 27 m. | 6 |
Above 27 m. upto 30 m. | 7 |
Above 30 m. upto 33 m. | 8 |
Above 33 m. | 9 |
Table 2
Total Area of Construction(Existing + Proposed) in Sq.m. | Factor to be Used |
Upto 100 Sq.m. | 0 |
Above 100 Sq.m. &. upto 200 Sq.m. | 10 |
Above 200 Sq.m. &. upto 300 Sq.m. | 20 |
Above 300 Sq.m. &. upto 400 Sq.m. | 30 |
Above 400 Sq.m. &. upto 500 Sq.m. | 40 |
Above 500 Sq.m. &. upto 600 Sq.m. | 50 |
Above 600 Sq.m. &. upto 700 Sq.m. | 60 |
Above 700 Sq.m. &. upto 800 Sq.m. | 70 |
Above 800 Sq.m. &. Upto 900 Sq.m. | 80 |
Above 900 Sq.m. &. upto 1000 Sq.m. | 90 |
Above 1000 Sq.m. &. upto 1100 Sq.m. | 100 |
Above 1100 Sq.m. &. upto 1200 Sq.m. | 110 |
Above 1200 Sq.m. &. upto 1300 Sq.m. | 120 |
Note :: This increase of Rupees 10 for every additional 100Sq.m. of area is increased to a maximum limit of 300.
MULTIPLYING FACTOR
Table 3
Category | Use Group | Type of Use | Multiplying factor on Scale of Fees as per Table2 |
A | Residential |
Dwelling a) Total covered area in all floors upto 1000 Sq.mtr. |
1.5 time 2 time 3 times 1 times |
B | Educational | I) Govt./Govt. Aided School, College, Day Care Center, Library etc II) Non Govt./Non Aided School, College etc. |
1 time 3 times |
C | Institutional | I) Govt./Govt. Aided Hospital, Clinic, Dispensary, Sanatorium, Custodial Institution, Mental Hospital, Nursing Home and Pathological lab etc. II) Non Govt./Non aided -do- |
1 time 4 times |
D | Assembly | I) Theatre Hall, Cinema Halls, City Halls, Drive in Theatre, Exhibition Hall, Museum, Skating rink, Gymnasium, Restaurants, Eating House, Hotel, Dormitory(No. of Beds more than 100), Dance Halls, Club-Room, Gymkhana, Passenger terminal, Stadium, Recreation Pier, yoga centers, Pathologial Laboratory etc. II) Place of Worship, Govt. aided Gymnasium & Yoga Center etc |
4 times
1 time |
E | Business | I) Office, Bank, Professional Establishment, Court Houses, Telephone room, Computer Office etc. II) I. T. Centre, Call Centre |
3 times 1 time |
F | Mercantile | Shop, Market, Store, Service Facility, Transport Establishments etc. | 6 times |
G | Industrial . | Fabrication/Assembly Plant, Laboratory, Power Plant, Smoke House, Refinery, Gas Plant, Mill, Dairy, Factory, Work-shop, Motor Garage, Printing Press etc. | 4 times |
H | Storage | Storage House, Ware House, Cold Storage, Freight Depot, Transit Depot, Store House, Public Garage, Truck Terminal, Stable, Barn etc. | 6 times |
I | Hazardous | Storage of Highly Combustible and Explosive material, Chemical Acid, Toxic materials, Fly ash, Dust, Fumes etc. | 4 times |
Note ::
- In case of Charitable institution, Govt. Sponsored Educational Institution, Govt. Sponsored Health Care unit and Place of Worship, Prayer for up to maximum limit of 50% of the above fees may be applicable.
- In case of development work relating to Charitable institution, Govt. Sponsored Educational Institution, Govt. Sponsored Health Care unit funded entirely by MP/MLA, no permit fees and charges will be levied on the basis of valid paper.
- For items which are not covered above that is in table 3, Charges will be levied as may be decided by mayor/MIC time to time.
- For use other than residential purpose in a residential class (predominant use ),charges is to levied according to type of use for that portion only.
- In addition to the basic scale of fees of sanctioned for the respective category of the building WT,ST & WS shall be realized as per rule.
Building Plan Proposal Application Fees (One time at the time of First Submission)
Table 4
Proposal Height | Fee applicable if primary Use is Residential/ Educational/Institutional (Rs.) | Fee applicable if primary Use is other than Residential/ Educational/Institutional (Rs.) |
Upto 7 m. | 2,000/- | 4,000/- |
Above 7 m. upto 10 m. | 5,000/- | 10,000/- |
Above 10 m. upto 12.5 m. | 10,000/- | 20,000/- |
Above 12.5 m. upto 15.5 m. | 12,000/- | 25,000/- |
Above 15.5 m. upto 20 m. | 15,000/- | 30,000/- |
Above 20 m. upto 40 m. | 20,000/- | 40,000/- |
Above 40 m. upto 60 m. | 25,000/- | 50,000/- |
Above 60 m. | 30,000/- | 60,000/- |
Note ::
- For any development work entirely funded by MP/MLA LAD fund or approved under any Central Govt or State Govt. Scheme for Urban Renewal Project No application fee will be leived.
- In case of Charitable institution, Govt. Sponsored Educational Institution, Govt. Sponsored Health Care unit and Place of Worship, Prayer for up to maximum limit of 50% of the above fees may be applicable.
- The items which are not covered in above shall be charged as will be decided by Mayor/MIC.
Wet Work Charge (WT) & Stacking Fees (ST)
Table 5
Sl. No. | Total Buildup Area(in Sq.m.) | Wet-Work Charge (WT) Rs. per Sq.m. of total covered area |
Stacking Fee (ST) Rs. per Sq.m. of total covered area of building for 3 months from the date of Commencement |
1 | Upto 115 Sq.m. | 20/- | 15/- |
2 | Above 115 Sq.m. upto 230 Sq.m. | 30/- | 20/- |
3 | Above 230 Sq.m. upto 465 Sq.m. | 35/- | 30/- |
4 | Above 465 Sq.m. upto 930 Sq.m. | 35/- | 45/- |
5 | Above 930 Sq.m. | 50/- | 50/- |
Waste Water Charges (WS)
Table 6
For masonry/R.C.C structures For Ground Floor or below G.F. | Rs. 12/- per Sqm. |
Do Above Ground Flore | Rs. 10/- per Sqm. |
In case of structures with masonry wall, CI or Asbestos or Ranigunge Tiles Roofing up to hight of 4.5 mt (New Case) | Rs. 8/- per Sqm |
In case of construction of structures with masonry wall, CI or Asbestos or Ranigunge Tiles Roofing up to hight of 4.5 mt over existing structure | Rs. 6/- per Sqm |
Fees For Drainage Development (New Proposal)
Table 7
For Ward 1 to 66 | Rate = (A/10+30) Rupees per Sqm of Covered Area subject to maximum of Rs. 100/- per Sqm of Covered Area |
Where A is the total proposed covered area of the Building or Total Land Area whichever is higher. Total Payable Amt. of Drainage Development Charge is (Rate X Total Covered Area). |
Note ::
- In case of revalidation /Renewal of the building plan which ware sanctioned after KMC Building rule was adopted for HMC area, Drainage Development Fees Have to be Charged as per above formula.
- No Drainage Development Fees will be charged in cases of renovation where no space is generated.
License Fees for Technical Personnel
Table 8
Technical Personnel | Category | Fees (in Rs.) for 1 yr |
Licensed Building Surveyor | Class – I | 2000/- |
Licensed Building Surveyor | Class – II | 1000/- |
Empanelled Structural Engineer | Class – I | 3500/- |
Empanelled Structural Engineer | Class – II | 2500/- |
Empanelled Geo-Technical Engineer | Class – I | 3500/- |
Empanelled Geo-Technical Engineer | Class – II | 2500/- |
Structural Reviewer & E.S.E.-I | Combined |
Late Fees | |
Late fee for renewal of License to be applicable from 1st July | |
1. Late fee for renewal of License | :Rs. 100/- per month or part thereof for L.B.S |
2. Late fee for renewal of License | Rs. 200/- per month or part thereof for E.S.E. |
3. Late fee for renewal of License | Rs. 200/- per month or part thereof for Geo-Tech Eng. |
4. Late fee for renewal of License | Rs. ****/– per month or part thereof for Structural Reviewer & E.S.E.-I (Combined) |
5. Fees for issuing duplicate License in case of Laws/Theft/Damage on production of requisite authentic document | Rs. 1200/- |
Fees for Internal Deviation
Fees for internal deviation which involves deviation from the sanctioned plan within the sanctioned covered space and external deviation from the sanctioned plan up to a limit of 10% of total sanctioned covered area which dose not infringe any building rule will be levied us following:-
Table 9
Sl. No | Total floor area considering all floor for which sanctioned was accorded | Amount of fees in rupees | Remarks |
1 | Upto 100 sq.m. | Rs. 1,500/- | Any excess area for external deviation (Up to a limit of 10% of the area of total covered area which does not infringe any building rule) over the sanctioned limit shall be charged as per sanctioned rate of fees, separately, if applicable, including all other relevant charges.( Sanction fees for excess total cover area to be calculate. |
2 | Above 100 sq.m. & upto 200 sq.m. | Rs. 3,000/- | |
3 | Above 200 sq.m.. & upto 300 sq.m. | Rs. 5,000/- | |
4 | Above 300 sq.m. & upto 500 sq.m. | Rs. 10,000/- | |
5 | Above 500 sq.m. & upto 750 sq.m. | Rs. 20,000/- | |
6 | Above 750 sq.m. & upto 1000 sq.m. | Rs. 32,000/- | |
7 | Above 1000 Sqm. | Rs. 1500/- per 100 sq.m. or part thereof for the area above 1000 Sqm. |
Note ::
For building other than Residential, Govt. Sponsored Educational Institution & charitable building two times the above mention (Table 9) have to be charged.
Fees for Completion certificate
A. For Residential, Educational & Institutional Building
Up to 200 | Above 200 up to 300 | Above 300 up to 500 | Above 500 up to 1000 | Above 1000 up to 1500 | Above 1500 for every 100 Sq.m. to be added with Column v part above 10 Sq.m. shall be taken as 100 Sq.m. for calculation.(Part up to 10 Sq.m. Shall be neglected) |
i | ii | iii | iv | v | vi |
4,000/- | 6,000/- | 10,000/- | 20,000/- | 25,000/- | 1000/- |
B. For Govt Sponsored Educational institution an charitable Building etc- Rs. 1000/- Only
C. For other category of building
Up to 300 Sq.m. | Above 300 up to 500 | Above 500 Sq.m. for every 100 Sq.m. to be added with Column ii |
i | ii | iii |
25,000/- | 50,000/- | 5,000/- |
Note ::
part above 10 Sq.m. shall be taken as 100 Sq.m. for calculation.(Part up to 10 Sq.m. Shall be neglected).
Fees for installation of Lift in existing building U/s 410 | |||
1. | In case of Residential Building Fees | : | Rs. 5000/- per Sqm. of ground covered area (To be used for such purpose) having authenticate document like sanctioned plan etc. |
2. | In case of Other than Residencial. | : | Rs. 12000/- per Sqm. of ground covered area of the lift well including lift loby |
Fees for Revised sanction
If any proposed revised plan is submitted in modification to a sanctioned building plan within its validity period then the higher of the following amounts will have to be paid by the applicant for revised sanction :-
- The amount of sanction fees including all other charges as per present submitted plan on the basis of present rate in excess of the amount paid during initial sanction.
- 25% of the sanction fees including all other charges as per present rate including all other charges as would be applicable from time to time.
- If it is found that more than such payable amount is already paid during initial sanction, No Refund will be made.
However at least 25% of the sanction fees including all other charges shall have to be paid for obtaining revised sanction. Other Fees as applicable will also be levied.
Charges for installation of Tower/Antenna/Pole (Subject to NOC from respective authority)
1. | Sanction fees for each Tower/Pole | Rs. 2,00,000/- (Two Lakhs) only |
2. | Retention fees for installation of each Tower/Pole installed without sanction |
Rs. 3,00,000/- (Three Lakhs) only |
Rate for demolition work
Cost to be realised from person responsible | Rs. 12,000 per 100 sqmt. |
-
Building Rule
-
LBS/ESE/GTE/ESR